{"id":1025199,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/1025199/?format=json","text_counter":246,"type":"speech","speaker_name":"North Horr, FAP","speaker_title":"Hon. Chachu Ganya","speaker":{"id":18,"legal_name":"Francis Chachu Ganya","slug":"francis-ganya"},"content":" I clearly or categorically said that, Hon. Temporary Deputy Speaker. At the outset, it was designed to fail. This dam had project consulting engineers and a panel of dam experts to support its technical work. These experts whom we invested in could not even get the design of the dam right from the beginning. There was a major design flaw which was noted at the construction of this dam. The delay in reviewing the original design cost the taxpayers additional Kshs1 billion in variation cost."}