{"id":104071,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/104071/?format=json","text_counter":96,"type":"speech","speaker_name":"Dr. Machage","speaker_title":"","speaker":{"id":179,"legal_name":"Wilfred Gisuka Machage","slug":"wilfred-machage"},"content":"Mr. Speaker, Sir, currently, there is a feasibility study being done with the support of the World Bank towards the possible construction of the corridor from Kibwezi-Kitui- Mwingi and its prioritized in the Ministry. I may not be able to give the exact time for this, but it is a priority as far as the Ministry is concerned. Meanwhile, with the Kshs20.8 million that I have allocated for the maintenance of this road, actually, I have released Kshs11.7 million for the procurement of minor maintenance works which is already going on. That is gravelling and drainage protection."}