{"id":116413,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/116413/?format=json","text_counter":45,"type":"speech","speaker_name":"Dr. Machage","speaker_title":"","speaker":{"id":179,"legal_name":"Wilfred Gisuka Machage","slug":"wilfred-machage"},"content":"It is true that we have done some work on this road. Actually, the design has been carried out in two lots with respective estimated cost of construction as follows. Lot 1 which is C112 â Nyongoro-Witu-Lamu otherwise known as âMokoweâ, which is approximately 80-kilometres is rated to cost about Kshs4.8 billion to be built whereas the Hindi-Milimani-Mangai and Kiunga which is D568, which is approximately 150- kilometres will cost about Kshs6.7 billion. A total of about Kshs11.5 billion is necessary for this road. I have set out to look for good friends to fund the construction of this road."}