{"id":117917,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/117917/?format=json","text_counter":47,"type":"speech","speaker_name":"Mr. Kinyanjui","speaker_title":"The Assistant Minister for Roads","speaker":{"id":48,"legal_name":"Lee Maiyani Kinyanjui","slug":"lee-kinyanjui"},"content":"(a) I am aware that the survey and detailed design of Sigalagala-Butere-Sidindi Road (D260) has been carried out at a cost of Kshs22,517,000."}