{"id":122043,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/122043/?format=json","text_counter":283,"type":"speech","speaker_name":"Mr. Kiilu","speaker_title":"","speaker":{"id":45,"legal_name":"Peter L. N. Kiilu","slug":"peter-kiilu"},"content":"asked the Minister for Energy:- (a) when the Kwasomba (Emali)/Masumba and Matiliku/Kilili Rural electricity projects, which were constructed in 2007, will be commissioned; (b) what the cost of each project was; and, (c) why Spring Hill Youth Polytechnic, Kwakivoko Market, Tutini Borehole and Kalima Market which are situated along Kwasomba- Masumba power line were not connected during the construction of the power line."}