{"id":1233067,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/1233067/?format=json","text_counter":249,"type":"speech","speaker_name":"Hon. Kipchumba Murkomen","speaker_title":"The Cabinet Secretary for Roads, Transport and Public Works","speaker":{"id":440,"legal_name":"Onesimus Kipchumba Murkomen","slug":"kipchumba-murkomen"},"content":" Hon. Speaker, I will proceed with Question No. 83 The construction of Mwingi-Slaughter House Road was done as part of the project for the construction of upgrading to bitumen standards of 3.7 kilometres KCB-Slaughter House Road in Mwingi, Kitui County, whose employer was the Department of Slum Upgrading under the State Department of Housing and Urban Development. I wish to state that, the Kenya Urban Roads Authority (KURA) was only called upon to provide project oversight role. The Project had 2 lots, that is lot 1 and 2. The Project contract sum was Ksh137,707,776.00 which covered 3.7 kilometers as indicated in the table below."}