{"id":127185,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/127185/?format=json","text_counter":64,"type":"speech","speaker_name":"Dr. Machage","speaker_title":"","speaker":{"id":179,"legal_name":"Wilfred Gisuka Machage","slug":"wilfred-machage"},"content":"Mr. Speaker, Sir, at that time, the road was designed to last for about five to ten years under the load that it was specifically designed for. That is low traffic. We used about Kshs40 million for construction of the road at that time."}