{"id":135842,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/135842/?format=json","text_counter":85,"type":"speech","speaker_name":"Mr. Konchella","speaker_title":"","speaker":{"id":322,"legal_name":"Gideon Sitelu Konchella","slug":"gideon-konchella"},"content":"Mr. Speaker, Sir, I thank the Assistant Minister for the answer; particularly part âbâ where the Ministry has designed, through the Lake Victoria Water Service Board, a project as a permanent solution to the water problem in Kilgoris of Kshs291 million. However, I am not very happy because it is not really the inadequacy of the sources of water and facilities but the lack of the completion of projects. I have a list of stalled projects for the last years which include both boreholes and dams. I do not have to read them because there are more than ten projects. I can probably hand the list to the Assistant Minister. When will those projects be completed?"}