{"id":143336,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/143336/?format=json","text_counter":157,"type":"speech","speaker_name":"Mr. Odhiambo","speaker_title":"","speaker":{"id":119,"legal_name":"Alfred Bwire Odhiambo","slug":"alfred-bwire"},"content":"Mr. Speaker, Sir, is the Assistant Minister aware that this road (C30) runs from Ejinja to Ruambwa? Why is it that it has been tarmacked half-way from Bumula to Ruambwa and left the upper part yet it is the same road? I also believe that a feasibility study has already been done."}