{"id":144171,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/144171/?format=json","text_counter":64,"type":"speech","speaker_name":"Mr. Mbai","speaker_title":"","speaker":{"id":181,"legal_name":"Benson Itwiku Mbai","slug":"benson-mbai"},"content":"asked the Minister for Roads:- (a) why the bridge which was supposed to have been constructed across Road E 626 on Thika River has not been constructed; and, (b) the urgent measures he is taking to construct this bridge which was meant to connect Masinga and Ndithini Divisions of Masinga Constituency."}