{"id":145117,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/145117/?format=json","text_counter":184,"type":"speech","speaker_name":"Mr. Duale","speaker_title":"The Assistant Minister for Livestock Development","speaker":{"id":15,"legal_name":"Aden Bare Duale","slug":"aden-duale"},"content":" Mr. Speaker, Sir, I beg to reply. (a) I am aware that there was poor workmanship during the construction of Kasigau Animal Holding rings. Therefore, the implementation team has instructed the responsible constructor to re-do the work. Meanwhile, the construction work at Ndi is"}