{"id":1457977,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/1457977/?format=json","text_counter":170,"type":"speech","speaker_name":"Ndia, UDA","speaker_title":"Hon. George Kariuki","speaker":null,"content":"In conclusion, with regard to the long-term measures the Ministry is taking to ensure the safety of residents during the heavy rains, the Ministry reported that the road section is a spur road that is planned to be upgraded to bitumen standards and the contractor is expected to resume works once the outstanding payments are fully made."}