{"id":159280,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/159280/?format=json","text_counter":71,"type":"speech","speaker_name":"Mr. Kinyanjui","speaker_title":"The Assistant Minister for Roads","speaker":{"id":48,"legal_name":"Lee Maiyani Kinyanjui","slug":"lee-kinyanjui"},"content":"(c) The contractor has covered the earthworks with sub-based quality graded crushed stone material from kilometre 15+000 to the end of the project at Mutarakwa which is kilometre 30+000 to reduce the dust that may be worse from sub-grade soils. However, this is a temporary measure as the project is expected to continue to completion."}