{"id":160914,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/160914/?format=json","text_counter":303,"type":"speech","speaker_name":"Mr. Musyoka","speaker_title":"","speaker":{"id":191,"legal_name":"Gideon Musyoka Ndambuki","slug":"gideon-ndambuki"},"content":"Mr. Temporary Deputy Speaker, Sir, the information I have is that two blocks are at a foundation level, that is, walling. For other three blocks, they are at foundation level and excavation has been done."}