{"id":162188,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/162188/?format=json","text_counter":173,"type":"speech","speaker_name":"Dr. Machage","speaker_title":"","speaker":{"id":179,"legal_name":"Wilfred Gisuka Machage","slug":"wilfred-machage"},"content":"Mr. Speaker, Sir, the design of Syotuvali Bridge and the approach road is under design by M/s Howard/Humphrey Consulting Engineers at Kshs15.9 million. The designing work started in September, 2008."}