{"id":170214,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/170214/?format=json","text_counter":126,"type":"speech","speaker_name":"Mr. Kajembe","speaker_title":"The Assistant Minister for Environment and Mineral Resources","speaker":{"id":163,"legal_name":"Ramadhan Seif Kajembe","slug":"ramadhan-kajembe"},"content":"In addition, my Ministry has directed the factory to instal a waste-water treatment plant for the treatment of water before being allowed to flow back to Voi River. The factory management was further directed to construct a closed drainage system with channels and special chambers to convey waste water from factory across the dry river bed to the effluent treatment plant to stop"}