{"id":1706,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/1706/?format=json","text_counter":230,"type":"speech","speaker_name":"Mr. Kinyanjui","speaker_title":"","speaker":{"id":48,"legal_name":"Lee Maiyani Kinyanjui","slug":"lee-kinyanjui"},"content":"On the second question, we also engaged a consultant, M/s Bundia Associates Engineering Company, to undertake preliminary design and detailed engineering design for improvement of the following 11 roads in Eastleigh: General Waruinge Road, which is two kilometres; Hombe Road, one kilometre; First Avenue, three kilometres; Second Avenue, two kilometres; Second Street, one kilometre; Third Street, 0.5 kilometres; Seventh Street, 0.5 kilometres; Fifteenth Street, 0.2 kilometres; Karongo Road, 0.25 kilometres; Wood Street, 0.25 kilometres; and part of Juja Road, measuring 5.5 kilometres."}