{"id":180808,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/180808/?format=json","text_counter":130,"type":"speech","speaker_name":"Mr. Mureithi","speaker_title":"","speaker":{"id":89,"legal_name":"Erastus Kihara Mureithi","slug":"erastus-mureithi"},"content":"Mr. Deputy Speaker, Sir, I am extremely disappointed by the answer that has been given by the Ministry. That is because I took the trouble to tour that road on Sunday. They have only finished a very small section in the Kipipiri area. The most unfortunate thing, before I ask my question, is that they have brought in surveyors all the way from China. According to the current philosophy of the road, they have used the terrain. Therefore, I feel very disappointed because they have even told us that they will not do the road to Ol Kalou---"}