{"id":188911,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/188911/?format=json","text_counter":127,"type":"speech","speaker_name":"Mr. Mwaita","speaker_title":"","speaker":{"id":100,"legal_name":"Sammy Sila Komen Mwaita","slug":"sammy-mwaita"},"content":"Mr. Speaker, Sir, the Assistant Minister has given a detailed answer. However, I wanted him to confirm whether the Engineer, who was supervising the works, may have failed in his duty, hence occasioning the failure by the contractor to fulfil his obligations."}