{"id":194699,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/194699/?format=json","text_counter":41,"type":"speech","speaker_name":"Mr. Ruteere","speaker_title":"","speaker":{"id":92,"legal_name":"Silas Muriuki Ruteere","slug":"silas-ruteere"},"content":"Mr. Deputy Speaker, Sir, the Ruire-Isiolo Road has taken more than six years to construct and this contract has been terminated. Could the Minister assure us that this road will not take much longer to get another contractor on site?"}