{"id":201462,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/201462/?format=json","text_counter":21,"type":"speech","speaker_name":"Mr. Awori","speaker_title":"","speaker":{"id":290,"legal_name":"Moody Arthur Awori","slug":"moody-awori"},"content":"Mr. Temporary Deputy Speaker, Sir, once the project is fully operational, and the outlying areas which fall within the catchment area make a request, they will be connected to the water line."}