{"id":208687,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/208687/?format=json","text_counter":121,"type":"speech","speaker_name":"Mr. Kiunjuri","speaker_title":"","speaker":{"id":175,"legal_name":"Festus Mwangi Kiunjuri","slug":"mwangi-kiunjuri"},"content":"Mr. Speaker, Sir, we have to wait until the investigations are completed. I do not know when the investigations will be completed. Secondly, I talked about 33-KV lines and 132-KV lines. The 132-KV line is the one that is already under construction."}