{"id":211977,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/211977/?format=json","text_counter":142,"type":"speech","speaker_name":"Mr. Kajwang","speaker_title":"","speaker":{"id":164,"legal_name":"Gerald Otieno Kajwang","slug":"otieno-kajwang"},"content":"asked the Minister for Energy:- (a) when the contractor will complete the construction of the Mbita Point- Tom Mboya Health Centre electricity line to enable the health centre and Tom Mboya Secondary School to be connected; and, (b) whether he could confirm that the schools along the line, namely Waware, Nyamuga and Wanyama will also be supplied with electricity."}