{"id":242100,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/242100/?format=json","text_counter":124,"type":"speech","speaker_name":"Mr. Kaindi","speaker_title":"","speaker":{"id":267,"legal_name":"Peter Kyalo Kaindi","slug":"peter-kaindi"},"content":"Mr. Speaker, Sir, yes, the bigger problem was the connection of power. The first payment was paid on 11th January, 2005. We have made follow-ups to that effect, so that power can be connected. The issue of the boiler has now been addressed. I have been assured of that this morning. Arrangements are underway to commission Itumbe and Eberege factories by the end of this month. I discussed that issue with the hon. Member. It is also my concern that we visit those areas and tackle the problems on the ground."}