{"id":242445,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/242445/?format=json","text_counter":116,"type":"speech","speaker_name":"Mr. Mbai","speaker_title":"","speaker":{"id":181,"legal_name":"Benson Itwiku Mbai","slug":"benson-mbai"},"content":"asked the Minister for Water and Irrigation:- (a) if he is aware that water pipes worth millions of shillings will go to waste as a result of the stalled Masinga Ekalakala Water Project; and, (b) what measures he is taking to revive the project."}