{"id":243823,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/243823/?format=json","text_counter":149,"type":"speech","speaker_name":"Mr. Shaaban","speaker_title":"","speaker":{"id":262,"legal_name":"Isaack Shaban","slug":"isaack-shaaban"},"content":"Mr. Temporary Deputy Speaker, Sir, there are already a lot of road construction projects going on within the City of Nairobi. The City Council is already putting in a lot of effort to put back the road network in Nairobi in place. Mr. Temporary Deputy Speaker, Sir, as I said, a lot of road projects in Eastleigh area are already ongoing. Many of the roads are being evaluated to ensure that they are passable."}