{"id":243831,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/243831/?format=json","text_counter":157,"type":"speech","speaker_name":"Mr. Shaaban","speaker_title":"","speaker":{"id":262,"legal_name":"Isaack Shaban","slug":"isaack-shaaban"},"content":"Mr. Temporary Deputy Speaker, Sir, I have already visited Eastleigh and inspected the roads I have mentioned. That is why I have told the House that work on them will be completed by the end of this month. Mr. Temporary Deputy Speaker, Sir, as I mentioned earlier, some roads are being repaired through the Fuel Levy Fund. These include Eastleigh Eighteenth Street and Mfududu Street."}