{"id":251846,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/251846/?format=json","text_counter":80,"type":"speech","speaker_name":"Mr. Kiunjuri","speaker_title":"","speaker":{"id":175,"legal_name":"Festus Mwangi Kiunjuri","slug":"mwangi-kiunjuri"},"content":"Mr. Speaker, Sir, it is the same prevailing condition that delayed us; that is the lack of designers and materials. I am assuring the House that we now have enough materials and the designers are already doing their work. From next month up to December, all those projects will be completed."}