{"id":274539,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/274539/?format=json","text_counter":133,"type":"speech","speaker_name":"Mr. Magwanga","speaker_title":"","speaker":{"id":73,"legal_name":"Joseph Oyugi Magwanga","slug":"joseph-magwanga"},"content":"Mr. Deputy Speaker, Sir, allow me to thank the Assistant Minister for attempting to answer the Question. This water project was actually commissioned in 1976. It was re-designed to enable just a quarter of the population in that area to get water. Since the time it was re-designed to-date, nothing much has been done. Close to 98 per cent of my constituents are not getting clean water. He has indicated that he has prepared a proposal. I prepared a proposal in 2008, which I presented to the Ministry. How long will it take the Ministry to forward this proposal to the donors to fund the project to enable my people to have clean water?"}