{"id":281770,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/281770/?format=json","text_counter":169,"type":"speech","speaker_name":"Mr. Ochieng","speaker_title":"","speaker":{"id":2955,"legal_name":"David Ouma Ochieng'","slug":"david-ouma-ochieng"},"content":"Madam Temporary Deputy Speaker, as I speak now, as the construction works continue on that particular bridge, there is a small diversion just next to the bridge. That diversion is worse when it rains. As you know, only trucks which carry a maximum of 5 tonnes are allowed to pass through that road. The entire diversion has now been taken to Road D218 which stretches from Sondu to Nyabondo to Kusa. That is a 26 kilometer stretch. Could the Assistant Minister confirm that as they work on that bridge, those two diversions will be maintained to motorable conditions?"}