{"id":30250,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/30250/?format=json","text_counter":232,"type":"speech","speaker_name":"Eng. M.M. Mahamud","speaker_title":"The Assistant Minister for Energy","speaker":{"id":373,"legal_name":"Mohammed Maalim Mahamud","slug":"mohammed-mahamud"},"content":" Mr. Deputy Speaker, Sir, the inheritance has not been done because--- The wells in Ol Karia which were drilled before the establishment of the GDC are 26. Another 10wells were done by the GDC. These wells will be improved by KenGen."}