{"id":302728,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/302728/?format=json","text_counter":66,"type":"speech","speaker_name":"Dr. Machage","speaker_title":"","speaker":{"id":179,"legal_name":"Wilfred Gisuka Machage","slug":"wilfred-machage"},"content":"Mr. Speaker, Sir, the information I have is that the works started in January, 2011 and the contract period was eight months. The information that I also have is that the designated work was done as per the contract. However, you will appreciate that the explanation I have from my engineers is that the road was further destroyed by the long rains. I may not be able to prove what the hon. Members want me to prove; that, that work had actually been done at that particular time. I can only go by the information I have from my technical team; that work that was designated to be done was actually done. But I will visit the place to get my own impression."}