{"id":319778,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/319778/?format=json","text_counter":152,"type":"speech","speaker_name":"Mr. Magerer","speaker_title":"","speaker":{"id":51,"legal_name":"Magerer Kiprono Langat","slug":"magerer-langat"},"content":"Mr. Deputy Speaker, Sir, if the hon. Member was listening, I have talked about “in the immediate to 2014.” Also, we expect a significant reduction between the year 2015 and 2018. That is after we have commissioned the two power plants; 280 megawatts and 560 megawatts generation."}