{"id":341481,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/341481/?format=json","text_counter":246,"type":"speech","speaker_name":"Mr. Chepkitony","speaker_title":"","speaker":{"id":13,"legal_name":"Lucas Kipkosgei Chepkitony","slug":"lucas-chepkitony"},"content":", asked the Minister for Energy:- (a) whether he is aware that construction of power transmission line from Iten township to Cheptongei/Kaposowar Town has stalled for the last six years; (b) what plans the Ministry has to complete the project; and, (c) what the cause of the frequent power blackouts is in Iten township and its environs."}