{"id":37321,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/37321/?format=json","text_counter":136,"type":"speech","speaker_name":"Mr. Gaichuhie","speaker_title":"","speaker":{"id":17,"legal_name":"Nelson Ributhi Gaichuhie","slug":"nelson-gaichuhie"},"content":"Mr. Speaker, Sir, the Minister has said that they had a lot of unforeseen earth works to do. I thought before they do a road, they always do a proper design, which takes a lot of time and money. Could he tell us why the designer of the road could not anticipate those earth works?"}