{"id":39511,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/39511/?format=json","text_counter":137,"type":"speech","speaker_name":"Eng. Maina","speaker_title":"","speaker":{"id":75,"legal_name":"Ephraim Mwangi Maina","slug":"ephraim-maina"},"content":"asked the Minister for Water and Irrigation:- (a) whether she is aware that the contractor at Hohwe Dam in Kirimukuyu Location, Mathira West District, dumped excavation materials at a site upstream the dam after completing the project, hence endangering the dam and damaging the environment; and, (b) what steps she will take to ensure that the excavation materials are disposed of appropriately. Mr. Temporary Deputy Speaker, Sir, up to now, I do not have the written response to this Question."}