{"id":42164,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/42164/?format=json","text_counter":271,"type":"speech","speaker_name":"Mr. Kimunya","speaker_title":"The Minister for Transport","speaker":{"id":174,"legal_name":"Amos Muhinga Kimunya","slug":"amos-kimunya"},"content":"After the assessment and re-evaluation of the contract, it was found prudent to renegotiate and restructure in a view to have the units rates addressed to reflect reality. The restructuring and renegotiations resulted in reduction in the lumpsum contract from Kshs3.04 billion to Kshs1.98 billion. There should be a letter within this document showing the revisions."}