{"id":52603,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/52603/?format=json","text_counter":188,"type":"other","speaker_name":"","speaker_title":"","speaker":null,"content":"2. In the relocation, a new scale was installed with a computerised ticketing system to make operations on the weighbridge faster. 3. As a long-term measure, my Ministry will install a lay bay on either side of the road for weighbridge operations. The lay bay will ensure that the operations of the weighbridges do not interfere with traffic on the highway."}