{"id":73849,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/73849/?format=json","text_counter":139,"type":"speech","speaker_name":"Mr. Bett","speaker_title":"","speaker":{"id":157,"legal_name":"Franklin Kipng'etich Bett","slug":"franklin-bett"},"content":"Mr. Deputy Speaker, Sir, I appreciate that many lives have been lost and we sympathize with the situation. That is why I have already said that I have instructed the Kenya Rural Roads Authority (KERRA) to quickly do a design to give me the estimated cost of a bridge. We think it can easily cost more than Kshs450 million. So before that can be factored into the budget, we have to know from the designers the estimated cost of that bridge."}