{"id":86282,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/86282/?format=json","text_counter":104,"type":"speech","speaker_name":"Mr. Kinyanjui","speaker_title":"The Assistant Minister for Roads","speaker":{"id":48,"legal_name":"Lee Maiyani Kinyanjui","slug":"lee-kinyanjui"},"content":"Mr. Speaker, Sir, the scope of the works in the contract indicated as follows: That the contractor would do site clearance and top soil stepping, earthworks; removal and reinstatement of all the failed road pavements to the inserted depth; repair of base using stabilized gravel material; repair of potholes, regulation and resurfacing using asphalt concrete; overlay and application of double sealing using size 14, 20 and 6:10 millimeter pilocated chippings; installation of new drainage structures and the cleaning of existing drainage structures, and: the repair of the shoulders that is the subject of this Question."}