{"id":86808,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/86808/?format=json","text_counter":208,"type":"speech","speaker_name":"Mr. Mwau","speaker_title":"","speaker":{"id":105,"legal_name":"John Harun Mwau","slug":"harun-mwau"},"content":"Mr. Speaker, Sir, I would not be in a position to consider that because currently we are renovating the airport. The space is not enough, we cannot allow more cargo. But after the renovation of the airport, then maybe, that will be considered in future."}