{"id":897858,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/897858/?format=json","text_counter":49,"type":"speech","speaker_name":"Hon. Ronald Tonui","speaker_title":"","speaker":{"id":1242,"legal_name":"Ronald Kiprotich Tonui","slug":"ronald-kiprotich-tonui"},"content":"(Biomet Central, JP) asked the Parliamentary Service Commission: (a) why a tunnel was constructed instead of an overhead flyover bridge in connecting Parliament Buildings; (b) what the cost of the project is and who the contractors are; (c) whether the construction of the tunnel project is part of the main office block contract or it is a variation; and, (d) What security, safety and health measures were taken into consideration while conceptualising, designing and constructing the tunnel project."}