{"id":89880,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/89880/?format=json","text_counter":150,"type":"speech","speaker_name":"Eng. M.M. Mahamud","speaker_title":"The Assistant Minister for Energy","speaker":{"id":373,"legal_name":"Mohammed Maalim Mahamud","slug":"mohammed-mahamud"},"content":"(c) I have instructed both the Rural Electrification Authority and the Kenya Power and Lighting Company to have Masinga-Undwani-Kutulye power line and all other projects already constructed and completed in Masinga Constituency not only energized but commissioned by the end of September, 2010."}