{"id":902610,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/902610/?format=json","text_counter":55,"type":"speech","speaker_name":"Sen. Halake","speaker_title":"","speaker":{"id":13184,"legal_name":"Abshiro Soka Halake","slug":"abshiro-soka-halake"},"content":"Sen. (Eng.) Mahamud said that the first pipeline was constructed in 1978 during the previous regimes. We see these things everywhere including in the water catchment areas. All the projects which were done in the early 1970s to 1990s are still intact. However, of late, everything seems to be falling apart."}