{"id":95642,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/95642/?format=json","text_counter":158,"type":"speech","speaker_name":"Mr. Mututho","speaker_title":"","speaker":{"id":97,"legal_name":"John Michael Njenga Mututho","slug":"john-mututho"},"content":"asked the Minister for Water and Irrigation:- (a) when she will commission Chemususu Dam to relieve pressure on tapping on River Malewa, which is the principal source of water for Lake Naivasha; (b) whether she could state the total cost of the project and also provide a breakdown detailing scope of works and cost of equipment; and, (c) what the cost/benefit analysis of this project is compared to Masinga Dam, in terms of cost per cubic metres of water stored, as well as the present and projected value."}