{"id":99245,"url":"http://info.mzalendo.com/api/v0.1/hansard/entries/99245/?format=json","text_counter":70,"type":"speech","speaker_name":"Mr. Bett","speaker_title":"","speaker":{"id":157,"legal_name":"Franklin Kipng'etich Bett","slug":"franklin-bett"},"content":"Mr. Speaker, Sir, yes, I am aware that a section of that road was washed away and that is why we have a contractor on site. I will not hesitate to add more money whenever I am able to, so that the road is made to the standard that is required. As regards the Eldoret-Kitale Road, I know that from Maili Tisa near Eldoret to Moiâs Bridge there is a bad section. I have placed a contractor on site and I have given him a further Kshs23 million to patch up the potholes."}