The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Embakasi

Emergency Reserve

location
Embakasi (in Embakasi)
year first funded
2004
action
In Case Of Emergency
output
Assist In Disaster
implementation status
Ongoing
total cost
Ksh 11,036,426
estimate
Ksh 11,000,000

Umoja / Tena Secondary School Construction

location
Umoja (in Embakasi)
year first funded
2005
action
Build School
output
Enhance Education
implementation status
Stalled At Slab Level.There Are Issues Of Land Ownership And The Case Is In Court.
total cost
Ksh 9,500,000
estimate
Ksh 4,000,000

Dandora Secondary School

location
Dandora (in Embakasi)
year first funded
2005
action
Build Dormitory
output
Enable Students To Board. Enhance Education
implementation status
Ongoing
total cost
Ksh 7,000,000
estimate
Ksh 2,000,000

Umoja & Embakasi Boys Secondary School

location
Umoja (in Embakasi)
year first funded
2003
action
Build School
output
Enhance Education
implementation status
Not Started
total cost
Ksh 6,000,000
estimate
Ksh 2,000,000

Administration

location
Embakasi (in Embakasi)
year first funded
2003
action
Co-Ordination Of C.D.F Projects
output
Effective Office Operation
implementation status
Ongoing
total cost
Ksh 5,312,514
estimate
Ksh 5,000,000

Kamulu Hospital

location
Ruai (in Embakasi)
year first funded
2006
action
Build Hospital
output
Easy Access To Medical Facility For The Community
implementation status
Not Yet Started
total cost
Ksh 5,000,000
estimate
Ksh 5,000,000

Dandora Police Post

location
Dandora (in Embakasi)
year first funded
2003
action
To Build P. Post
output
To Safe Guard Area Community
implementation status
Ongoing
total cost
Ksh 4,687,000
estimate
Ksh 5,000,000

Matopeni Primary School

location
Kayole (in Embakasi)
year first funded
2005
action
Construction of Classrooms, An Administration Block & A Toilet Block
output
Enhance Education
implementation status
98% Complete
total cost
Ksh 4,218,468
estimate
Ksh 4,000,000

Kamulu & Embakasi Hospital Construction

location
Embakasi (in Embakasi)
year first funded
2007
action
Build Hospital
output
Make Medical Facilities Accessible To The Community
implementation status
Not Started
total cost
Ksh 4,000,000
estimate
Ksh 4,000,000

Njiru Primary School Construction Of Classrooms

location
Njiru (in Embakasi)
year first funded
2007
action
Construction Of Classrooms
output
Enhance Education
implementation status
Ongoing
total cost
Ksh 3,000,000
estimate
Ksh 15,000,000

Emergency Reserve

location
Embakasi (in Embakasi)
year first funded
2009
action
In Case Of Emergency
output
Assist In Disaster
implementation status
Ongoing
total cost
Ksh 2,847,481
estimate
Ksh 3,000,000

Hondrmwenje Secondary School Office & Kitche

location
Kariobangi South (in Embakasi)
year first funded
2006
action
Construction Of Office Kitchen, Dormitory
output
Increased Learning Facilities
implementation status
Complete
total cost
Ksh 2,732,000
estimate
Ksh 5,000,000

Dandora Hospital

location
Dandora (in Embakasi)
year first funded
2009
action
Complete Construction Of Boundary Wall And Renovate The Hospital
output
Enhance Security At The Hospital And Improve Facilities
implementation status
Boundary Wall Is 95% Completerenovation Is 40% Complete
total cost
Ksh 2,500,000
estimate
Ksh 25,000,000

Njiru Ap Camp Ii

location
Njiru (in Embakasi)
year first funded
2009
action
Complete Construction Of An Administration Block And Housing Units
output
Improve Living Standards And Working Conditions Of Ap Officers
implementation status
Ongoing
total cost
Ksh 2,489,528
estimate
Ksh 3,000,000

Bursary Funds

location
Embakasi (in Embakasi)
year first funded
2005
action
Awarding Bursary Bright/ Needy Students
output
Increased Access To Education
implementation status
Ongoing
total cost
Ksh 2,400,000
estimate
Ksh 6,000,000

Dandora A Public Toilet Umoja Market Public Toile

location
Dandora (in Embakasi)
year first funded
2005
action
Build Toilet
output
To Provide Clean & Better Sanitation To The Community
implementation status
Complete& In Use
total cost
Ksh 2,056,296
estimate
Ksh 3,000,000

Afforestation Project

location
Embakasi (in Embakasi)
year first funded
2005
action
Plant Trees
output
Preserve Environment
implementation status
Complete
total cost
Ksh 2,043,704
estimate
Ksh 2,000,000

Kariobangi South Public Toilet

location
Kariobangi (in Embakasi)
year first funded
2004
action
Build Toilet
output
For The Public To Use
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 1,000,000

Jacaranda Road

location
Kayole (in Embakasi)
year first funded
2005
action
Rehabilitate Road
output
Make It Passable To The Community
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 4,000,000

Dandora Hospital Boundary Wall & Rehabilitation

location
Dandora (in Embakasi)
year first funded
2007
action
Rehabilitate And Construction of Boundary Wall Around The Hospital
output
Enhance Security & Safeguard Hospital Equipment
implementation status
Wall Is Complete Renovations Are Ongoing
total cost
Ksh 1,945,766
estimate
Ksh 4,000,000

Mukuru Health Centre

location
Mukuru Kwa Njenga (in Embakasi)
year first funded
2008
action
Complete Construction Of A Perimeter Wall.
output
Enhance Security & Safeguard Hospital Equipment
implementation status
95% Complete
total cost
Ksh 1,696,432
estimate
Ksh 2,000,000

Ruai Boys Secondary School

location
Ruai (in Embakasi)
year first funded
2009
action
Complete Construction Of 8 Classrooms And A Toilet Block
output
Enhance Education
implementation status
complete
total cost
Ksh 1,500,000
estimate
Ksh 42,000,000

Ruai Girls Secondary School

location
Ruai (in Embakasi)
year first funded
2009
action
Complete Construction Of 4 Multi Storeyed Classrooms
output
Enhance Education
implementation status
Complete And In Use
total cost
Ksh 1,500,000
estimate
Ksh 49,000,000

Dandora Secondary School

location
Dandora (in Embakasi)
year first funded
2009
action
Complete Construction Of Dining Hall
output
Provide Dining Place For Students Who Currently Eat Outside
implementation status
60% Complete. Work Done Up To The Ring Beam Level.
total cost
Ksh 1,500,000
estimate
Ksh 2,000,000

Gitari Marigu Toilet

location
Dandora (in Embakasi)
year first funded
2007
action
Build New Toilet
output
Provide Clean & Better Sanitation To The Community
implementation status
Not Started
total cost
Ksh 1,500,000
estimate
Ksh 1,000,000

Njiru Market Shade

location
Njiru (in Embakasi)
year first funded
2006
action
Build Shades
output
To Protect People In The Market From Rain Or Sun
implementation status
Not Started
total cost
Ksh 1,500,000
estimate
Ksh 1,000,000

Umoja / Kariobangi Secondary School Dormitory

location
Kariobangi South (in Embakasi)
year first funded
2005
action
n/a
output
Enhance Education
implementation status
Not Started
total cost
Ksh 1,500,000
estimate
Ksh 2,000,000

Maili Saba Secondary School

location
Njiru (in Embakasi)
year first funded
2008
action
Construction of 4 Multi Storey Class Rooms Upto & Including The Slab Level, Stair Case And A Toilet Block.
output
Enhance Education
implementation status
Ongoing 90% Complete
total cost
Ksh 1,494,724
estimate
Ksh 4,000,000

Administration

location
Embakasi (in Embakasi)
year first funded
2009
action
Co-Ordination Of C.D.F Projects
output
Effective Office Operation
implementation status
Ongoing
total cost
Ksh 1,469,011
estimate
Ksh 2,000,000

Dandora Secondary School

location
Dandora (in Embakasi)
year first funded
2008
action
Complete Construction Of A Single Storey Dining Hall
output
Provide A Spacious Dining Area For Students
implementation status
60% Complete. Work Done Up To The Ring Beam Level.
total cost
Ksh 1,400,000
estimate
Ksh 2,000,000

Dandora Secondary School

location
Dandora (in Embakasi)
year first funded
2008
action
Construction of Boundary Wall Around The School
output
Separate The School From Garbage Site & Enhance Security
implementation status
90% Complete
total cost
Ksh 1,339,802
estimate
Ksh 15,000,000

Mailisaba/Dandora Foot Bridge

location
Dandora /Njiru (in Embakasi)
year first funded
2005
action
Rehabilitate A Bridge
output
Safe To Cross
implementation status
Not Started
total cost
Ksh 1,300,000
estimate
Ksh 4,000,000

Kayole Secondary School

location
Kayole (in Embakasi)
year first funded
2008
action
Construction of Multi Storey Block With Offices, Laboratories And Class Rooms On Top.
output
Enhance Education
implementation status
Ongoing. 80% Complete
total cost
Ksh 1,261,518
estimate
Ksh 3,000,000

Dandora Girls Secondary School

location
Dandora (in Embakasi)
year first funded
2008
action
Construction of School
output
Enhance Education
implementation status
Not Started
total cost
Ksh 1,200,000
estimate
Ksh 2,000,000

Ushirika Primary School I

location
Dandora (in Embakasi)
year first funded
2008
action
Complete Construction Of 6 Classrooms
output
Enhance Education
implementation status
90% Complete
total cost
Ksh 1,166,500
estimate
Ksh 3,000,000

Ruai Girls Secondary School

location
Ruai (in Embakasi)
year first funded
2008
action
Construction of 8 Multi Storey Classrooms
output
Enhance Education
implementation status
Ongoing 80% Complete
total cost
Ksh 1,150,000
estimate
Ksh 3,000,000

Njiru Ap Camp

location
Njiru (in Embakasi)
year first funded
2008
action
Complete A Residential Block (11 Housing Units) For The Aps
output
Provide Accommodation For The Aps And Enhance Security
implementation status
90% Complete
total cost
Ksh 1,035,820
estimate
Ksh 2,000,000

Umoja Police Post

location
Umoja (in Embakasi)
year first funded
2005
action
Build Police Post
output
Enhance Security To The Community
implementation status
Not Started
total cost
Ksh 1,000,197
estimate
Ksh 1,000,000

Mailisaba Secondary School Ii

location
Njiru (in Embakasi)
year first funded
2009
action
Complete Construction Of 4 Upper Class Rooms Including The Roof
output
Enhance Education
implementation status
95% Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Embakasi Maternity Construction

location
Embakasi (in Embakasi)
year first funded
2009
action
Construction of Maternity Wing At The Clinic
output
Provide Maternity Services At The Centre
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 49,000,000

Njiru Clinic

location
Njiru (in Embakasi)
year first funded
2009
action
Construction of Maternity Wing At The Clinic
output
Provide Maternity Services At The Centre
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 49,000,000

Mihango Health Centre

location
Mihango (in Embakasi)
year first funded
2009
action
Construction of Clinic
output
Provide Health Centre, Facility And Services
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kayole Secondary School

location
Kayole (in Embakasi)
year first funded
2009
action
Complete Construction Of Multi Storey Block With Offices, Laboratories And Class Rooms On Top.
output
Enhance Education
implementation status
95% Complete
total cost
Ksh 1,000,000
estimate
Ksh 500,000

Njiru Primary School i

location
Njiru (in Embakasi)
year first funded
2009
action
Construction of 4 Classrooms
output
Enhance Education
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 17,000,000

Ngundu Community Clinic

location
NgUndu (in Embakasi)
year first funded
2009
action
Construction of Maternity Wing At The Clinic
output
Provide Maternity Services At The Centre
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 49,000,000

Rehabilitation Of Sewer Lines

location
Embakasi (in Embakasi)
year first funded
2006
action
Cleaning Of Sewer Lines
output
Clean Environment
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Umoja Social Hall

location
Umoja (in Embakasi)
year first funded
2005
action
Build Hall
output
For Community Use During Functions
implementation status
Not Started
total cost
Ksh 1,000,000
estimate
Ksh 13,000,000

Kayole Water Project Matopen

location
Kayole (in Embakasi)
year first funded
2005
action
Connect Water To Community
output
Bring Water Close To People
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 55,000,000

Kayole Administration Police Residential Houses

location
Kayole (in Embakasi)
year first funded
2005
action
Build Ap Houses
output
Enhance Security To The Community
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Cleaning Environment

location
Embakasi (in Embakasi)
year first funded
2005
action
Cleaning Sewers
output
Clean Environment
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Jua Kali Sheds

location
Embakasi (in Embakasi)
year first funded
2005
action
Build Sheds
output
Prevent Sun & Rain
implementation status
Ongoing(70% Complete)
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ruai Hospital Rehabilitation

location
Ruai (in Embakasi)
year first funded
2007
action
Rehabilitation Of Hospital
output
Enhance Medical Facility
implementation status
Not Started
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Embakasi Public Toilet Rehabilitation

location
Embakasi (in Embakasi)
year first funded
2007
action
Rehabilitation Of Toilet
output
Provide Clean & Better Sanitation To The Community
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Gituambaa / Makongeni Water Project

location
Ruai (in Embakasi)
year first funded
2008
action
n/a
output
Bring Water Close To The People
implementation status
Not Started
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Peter Kibukosya Primary School

location
Umoja (in Embakasi)
year first funded
2008
action
Construction of Classrooms
output
Enhance Education
implementation status
Not Started
total cost
Ksh 1,000,000
estimate
Ksh 3,000,000

Ruai Boys Secondary School

location
Ruai (in Embakasi)
year first funded
2008
action
Construction of Classrooms
output
Enhance Education
implementation status
Ongoing 80% Complete
total cost
Ksh 1,000,000
estimate
Ksh 3,000,000

Ushirika Primary School Ii

location
Dandora (in Embakasi)
year first funded
2008
action
Complete Construction Of 3 Class Rooms
output
Enhance Education
implementation status
80% Complete
total cost
Ksh 1,000,000
estimate
Ksh 2,000,000

Saika Primary School

location
Njiru (in Embakasi)
year first funded
2008
action
Construction of Class Rooms
output
Enhance Education
implementation status
Not Started
total cost
Ksh 1,000,000
estimate
Ksh 2,000,000

Njiru Secondary School

location
Njiru (in Embakasi)
year first funded
2008
action
Construction Of Class Rooms
output
Enhance Education
implementation status
Not Started
total cost
Ksh 1,000,000
estimate
Ksh 2,000,000

Dandora Dos Office

location
Dandora (in Embakasi)
year first funded
2009
action
Construction of DoS Office
output
Provide Administration Offices For The Do
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 2,000,000

Mailisaba Secondary School I

location
Njiru (in Embakasi)
year first funded
2009
action
Complete Construction Of 4 Multi Storey Class Rooms Upto & Including The Slab Level, Stair Case And A Toilet Block.
output
Enhance Education
implementation status
98% Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Environmental Activities

location
Embakasi (in Embakasi)
year first funded
2009
action
Tree Planting In Various Wards In Embakasi
output
Protect The Environment
implementation status
Ongoing
total cost
Ksh 979,340
estimate
Ksh 1,000,000

Monitoring & Evaluation

location
Embakasi (in Embakasi)
year first funded
2009
action
Assist In Monitoring, Evaluation & Capacity Building
output
Project Monitoring & Evaluation
implementation status
Ongoing
total cost
Ksh 979,340
estimate
Ksh 0

Mukuru Health Centre Wall

location
Mukuru Kwa Njenga (in Embakasi)
year first funded
2009
action
Rehabilitation Of Mukuru Health Centre
output
Improve The Facility
implementation status
Ongoing
total cost
Ksh 900,000
estimate
Ksh 49,000,000

Ushirika Secondary School

location
Dandora (in Embakasi)
year first funded
2009
action
Construction of 4 Classrooms And A Stair Case
output
Enhance Education
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Dandora Girls Secondary School

location
Dandora (in Embakasi)
year first funded
2009
action
Construction of 3 Classrooms, Stair Case And A Toilet Block
output
Enhance Education
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 5,000,000

Super Loaf Primary School

location
Kariobangi South (in Embakasi)
year first funded
2009
action
Construction of 4 Classrooms And A Toilet Block
output
Enhance Education
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 49,000,000

Dr Mwenje Secondary School

location
Kariobangi South (in Embakasi)
year first funded
2009
action
Construction of 3 Classrooms
output
Enhance Education
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 49,000,000

Kayole South Secondary School

location
Kayole (in Embakasi)
year first funded
2009
action
Construction of 3 Classrooms And Stair Case
output
Enhance Education
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 4,000,000

Embakasi Village Garrison Primary School

location
Embakasi (in Embakasi)
year first funded
2009
action
Assist The Embakasi Garrison Construction of Classrooms (Co-Funding)
output
Enhance Education
implementation status
Not Started
total cost
Ksh 700,000
estimate
Ksh 48,000,000

Imara Primary School

location
Imara (in Embakasi)
year first funded
2009
action
Construction Of 1 Classroom
output
Enhance Education
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 0

Kariobangi South Primary School

location
Kariobangi (in Embakasi)
year first funded
2009
action
Construction Of Perimeter Wall
output
Enhance Education
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 800,000

Njiru Public Toilet

location
Njiru (in Embakasi)
year first funded
2005
action
Build Toilet
output
Clean Sanitation To The Community
implementation status
Complete & In Use
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Ruai Road

location
Ruai (in Embakasi)
year first funded
2005
action
Rehabilitate The Road
output
Make The Road Accessible For The Community To Use
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Dandora Secondary School

location
Dandora (in Embakasi)
year first funded
2009
action
Complete Construction Of A Perimeter Wall Around The School
output
Enhance Security, Since The School Borders The Dandora Dump Site
implementation status
95% Complete
total cost
Ksh 553,000
estimate
Ksh 1,000,000

Mukuru Kwa Njenga Bridge

location
Mukuru Kwa Njenga (in Embakasi)
year first funded
2009
action
Construction of Foot Bridge
output
Assist The Community To Cross Over Safely
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Baraka / Dandora Bridge

location
Dandora (in Embakasi)
year first funded
2009
action
Construction of Foot Bridge
output
Assist The Community To Cross Over Safely
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Umoja Ii Jua Kali Market Fencing

location
Umoja (in Embakasi)
year first funded
2008
action
Fencing The Umoja Ii Jua Kali Market.
output
Enhance Security At The Market &
implementation status
Not Started
total cost
Ksh 500,000
estimate
Ksh 500,000

Umoja Ii Stage

location
Umoja (in Embakasi)
year first funded
2008
action
Construction of A New Bus Stage
output
Decongestion Of Umoja Ii Stage
implementation status
Not Started
total cost
Ksh 500,000
estimate
Ksh 500,000

Umoja I Market Fencing & Toilet Rehabilitation

location
Umoja (in Embakasi)
year first funded
2008
action
Construction of Boundary Wall & Rehabilitate Toilet
output
Improve Sanitation
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Bondeni & Unity Primary School

location
Kayole (in Embakasi)
year first funded
2006
action
Assist School In Construction
output
Enhance Education
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Kayole School Toilet Block

location
Kayole (in Embakasi)
year first funded
2006
action
Rehabilitate Toilet Block
output
Enhance Better Sanitation For The Community
implementation status
Not Started
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Busara Primary School

location
Umoja (in Embakasi)
year first funded
2006
action
Assist In Hall Construction
output
For Children?S Use In School
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kayole Hospital Maternity

location
Kayole (in Embakasi)
year first funded
2006
action
Assist The Maternity Wing
output
Improve Women Facilities During Delivery
implementation status
Not Started
total cost
Ksh 485,693
estimate
Ksh 500,000

M & E

location
Embakasi (in Embakasi)
year first funded
2008
action
Facilitate In Capacity Building And M& E Of Projects
output
Project Monitoring & Evaluation
implementation status
Ongoing
total cost
Ksh 468,330
estimate
Ksh 1,000,000

Matopeni Primary School

location
Kayole (in Embakasi)
year first funded
2009
action
Complete Construction Of Classrooms, An Administration Block & A Toilet Block
output
Enhance Education
implementation status
98% Complete
total cost
Ksh 400,000
estimate
Ksh 49,000,000

Kayole Secondary School Temporary Dining Hall

location
Kayole (in Embakasi)
year first funded
2007
action
Build A Temporary Dining
output
Provide Students With A Dining Hall
implementation status
Not Started
total cost
Ksh 300,000
estimate
Ksh 300,000

Athi Primary School

location
Ruai (in Embakasi)
year first funded
2006
action
Buy Desks
output
Assist Children To Write On
implementation status
Complete.
total cost
Ksh 300,000
estimate
Ksh 300,000

Umoja Iii Kangurue Street Light

location
Kariobangi South (in Embakasi)
year first funded
2009
action
Install Security Light
output
Enhance Security
implementation status
Complete
total cost
Ksh 240,000
estimate
Ksh 300,000

Umoja Iii Mungetho Street Light

location
Kariobangi South (in Embakasi)
year first funded
2009
action
Install Security Light
output
Enhance Security
implementation status
Complete
total cost
Ksh 240,000
estimate
Ksh 300,000

Umoja Iii G Stage Street Light

location
Kariobangi South (in Embakasi)
year first funded
2009
action
Install Security Light
output
Enhance Security
implementation status
Complete
total cost
Ksh 240,000
estimate
Ksh 300,000

Dandora V Near The Ap Post

location
Dandora (in Embakasi)
year first funded
2008
action
Install Security Light In The Area
output
Enhance Security
implementation status
Ongoing
total cost
Ksh 240,000
estimate
Ksh 250,000

Dandora Iii Near Post Office

location
Dandora (in Embakasi)
year first funded
2008
action
Install Security Light In The Area
output
Enhance Security
implementation status
Ongoing
total cost
Ksh 240,000
estimate
Ksh 250,000

Soweto Catholic Church

location
Kayole (in Embakasi)
year first funded
2008
action
Install Security Light In The Area
output
Enhance Security
implementation status
Ongoing
total cost
Ksh 240,000
estimate
Ksh 250,000

Soweto Patanisho

location
Kayole (in Embakasi)
year first funded
2008
action
Install Security Light In The Area
output
Enhance Security
implementation status
Ongoing
total cost
Ksh 240,000
estimate
Ksh 250,000

Kayole Corner

location
Kayole (in Embakasi)
year first funded
2008
action
Install Security Light In The Area
output
Enhance Security
implementation status
Ongoing
total cost
Ksh 240,000
estimate
Ksh 250,000

Umoja Iii Kangurue

location
Kariobangi South (in Embakasi)
year first funded
2008
action
Install Security Light In The Area
output
Enhance Security
implementation status
Was Ongoing But Later Brought Down By Lorry
total cost
Ksh 240,000
estimate
Ksh 250,000

Umoja Iii Mungetho

location
Kariobangi South (in Embakasi)
year first funded
2008
action
Install Security Light In The Area
output
Enhance Security
implementation status
Complete & In Working Condition
total cost
Ksh 240,000
estimate
Ksh 250,000

Umoja Iii G Stage

location
Kariobangi South (in Embakasi)
year first funded
2008
action
Install Security Light In The Area
output
Enhance Security
implementation status
Complete & In Working Condition
total cost
Ksh 240,000
estimate
Ksh 250,000

Benrose / Kangundo Road Junctioin

location
Kariobangi South (in Embakasi)
year first funded
2008
action
Install Security Light In The Area
output
Enhance Security
implementation status
Complete & In Working Condition
total cost
Ksh 240,000
estimate
Ksh 250,000

Umoja Ii Next To Basketball Ground

location
Umoja (in Embakasi)
year first funded
2008
action
Install Security Light In The Area
output
Enhance Security
implementation status
Complete & In Working Condition
total cost
Ksh 240,000
estimate
Ksh 250,000

Umoja Ii Next To Open Ground

location
Umoja (in Embakasi)
year first funded
2008
action
Install Security Light In The Area
output
Enhance Security
implementation status
Complete & In Working Condition
total cost
Ksh 240,000
estimate
Ksh 250,000

Umoja Ii Next To Catholic Church

location
Umoja (in Embakasi)
year first funded
2008
action
Install Security Light In The Area
output
Enhance Security
implementation status
Complete & In Working Condition
total cost
Ksh 240,000
estimate
Ksh 250,000

Umoja Ii Near Unity Pcea

location
Umoja (in Embakasi)
year first funded
2008
action
Install Security Light In The Area
output
Enhance Security
implementation status
Complete & In Working Condition
total cost
Ksh 240,000
estimate
Ksh 250,000

Soweto Catholic Church Street Light

location
Kayole (in Embakasi)
year first funded
2009
action
Install Security Light
output
Enhance Security
implementation status
Ongoing
total cost
Ksh 240,000
estimate
Ksh 300,000

Soweto Patanisho Street Light

location
Kayole (in Embakasi)
year first funded
2009
action
Install Security Light
output
Enhance Security
implementation status
Ongoing
total cost
Ksh 240,000
estimate
Ksh 300,000

Kayole Corner Street Light

location
Kayole (in Embakasi)
year first funded
2009
action
Install Security Light
output
Enhance Security
implementation status
Was Ongoing
total cost
Ksh 240,000
estimate
Ksh 300,000

Mwangaza & Kayole Primary School desks

location
Kayole (in Embakasi)
year first funded
2006
action
Buy Desks
output
Assist Children To Write On
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 300,000

Repair / Completion Of Two Lights

location
Dandora (in Embakasi)
year first funded
2008
action
Install Security Light In The Area
output
Enhance Security
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 250,000

Jehova Jire Primary School Energy Saving Jikos

location
Dandora (in Embakasi)
year first funded
2007
action
Purchase Energy Saving Jikos For The School
output
Improved Methods Of Energy Saving In The School
implementation status
Not Started
total cost
Ksh 200,000
estimate
Ksh 200,000

James Gichuru Primary School Staff Chairs

location
Dandora (in Embakasi)
year first funded
2007
action
Purchase Chairs For Staff
output
Promote A Conducive Teaching Environment
implementation status
Not Started
total cost
Ksh 200,000
estimate
Ksh 200,000

Dandora Primary School

location
Dandora (in Embakasi)
year first funded
2007
action
Purchase Desks For The School
output
Promote A Conducive Learning Environment
implementation status
Not Started
total cost
Ksh 200,000
estimate
Ksh 200,000

Embakasi Primary School Repair Of Toilets

location
Embakasi (in Embakasi)
year first funded
2007
action
Repair Of Toilets
output
Clean & Better Sanitation
implementation status
Not Started
total cost
Ksh 200,000
estimate
Ksh 200,000

Muoroto Sewer Line

location
Dandora (in Embakasi)
year first funded
2005
action
Clean Sewer Line
output
Clean Environment
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Kinyago Police Post Fencing

location
Dandora (in Embakasi)
year first funded
2003
action
Fencing Post
output
To Safe Guard Post From Trespassers
implementation status
Complete
total cost
Ksh 133,000
estimate
Ksh 200,000

Dandora Community Primary School

location
Dandora (in Embakasi)
year first funded
2006
action
Assist To Build Classroom
output
Enhance Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Baraka Primary School

location
Dandora (in Embakasi)
year first funded
2006
action
Assist In Classroom Construction
output
Enhance Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kayole South Secondary School

location
Kayole (in Embakasi)
year first funded
2009
action
Construction of 3 Classrooms And Stair Case
output
Enhance Education
implementation status
Ongoing
total cost
Ksh 85,300
estimate
Ksh 41,000,000

St. Dominic Primary School Computers

location
Njiru (in Embakasi)
year first funded
2007
action
Purchase Computers
output
Enhance Computer Literacy
implementation status
Not Started
total cost
Ksh 80,000
estimate
Ksh 100,000

Dandora Primary School

location
Dandora (in Embakasi)
year first funded
2007
action
Purchase Computers
output
Enhance Computer Literacy
implementation status
Not Started
total cost
Ksh 80,000
estimate
Ksh 100,000

Embakasi Village Primary School

location
Embakasi (in Embakasi)
year first funded
2007
action
Purchase Computers
output
Enhance Computer Literacy
implementation status
Not Started
total cost
Ksh 80,000
estimate
Ksh 100,000

Ushirika Primary School Computers

location
Dandora (in Embakasi)
year first funded
2007
action
Purchase Computers
output
Enhance Computer Literacy
implementation status
Not Started
total cost
Ksh 80,000
estimate
Ksh 100,000