GET /api/v0.1/hansard/entries/1010562/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 1010562,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/1010562/?format=api",
    "text_counter": 59,
    "type": "speech",
    "speaker_name": "Wundanyi, WDM-K",
    "speaker_title": "Hon. Danson Mwashako",
    "speaker": {
        "id": 13509,
        "legal_name": "Danson Mwashako Mwakuwona",
        "slug": "danson-mwashako-mwakuwona"
    },
    "content": " Thank you, Hon. Speaker. I rise to ask the CS for Transport, Infrastructure, Housing, Urban Development and Works the following Question: (i) Could the Cabinet Secretary provide a list of all constituencies in the country without a single kilometre of road or with less than 5 kilometres of road of bitumen standards, commonly referred to as tarmac, and clarify whether it is of low volume seal or otherwise and, further, list of all constituencies without a single kilometre of Kenya Rural Roads Authority (KeRRA) roads of bitumen standards? (ii) What is the status of implementation of the road construction under low volume seal programme in Kenya, how many kilometres of road under this programme have been done in each county, and which constituencies are yet to benefit? (iii) What plans has the Ministry put in place to ensure that roads are constructed to bitumen standards in Wundanyi Constituency, considering that the constituency does not even have a single kilometre of tarmac road? (iv) What is the status of construction of the 55-km Bura – Mghange - Werugha – Mbale – Mtomwagodi Road considering that it was launched for construction in 2017 by the President to serve Wundanyi and Mwatate constituencies and when will it commence?"
}