GET /api/v0.1/hansard/entries/1021722/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 1021722,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/1021722/?format=api",
"text_counter": 298,
"type": "speech",
"speaker_name": "Navakholo, JP",
"speaker_title": "Hon. Emmanuel Wangwe",
"speaker": {
"id": 2543,
"legal_name": "Emmanuel Wangwe",
"slug": "emmanuel-wangwe"
},
"content": "chairman, that the person is investigated. Let his side of the story be told so that things can become better. The final agency I would want to talk about is the Kenya Airports Authority (KAA) whereby procurement law was not adhered to when there was a scope change in the contract for the runway project. This makes it hard to determine. The contract was not to be paid because of missing progress reports for the temporary offices. Stores and other facilities fee of Kshs23,624,978 was paid despite the offices being non-existent during the contract period. Paying Kshs23,624,978 for a non-existent project as far as the PIC Report is concerned is something that each one should condemn. The only rightful authorities to tell us whether this happened are the DCI and EACC. Let them read through the books. Now that the Chair has pointed out, let us have it audited to the letter and if they are found culpable, they be held to account. With that, I beg to support the Report."
}