    "speaker_name": "Mr. Keter",
    "speaker_title": "The Assistant Minister for Energy",
    "speaker": {
        "id": 169,
        "legal_name": "Charles Cheruiyot Keter",
        "slug": "charles-keter"
    },
    "content": " Mr. Temporary Deputy Speaker, Sir, I beg to reply. (a) The power line to supply Nyatoto Market was energized in November, 2009 with construction having commenced in 2007. The construction was about 7 kilometres long with six transformers. However, the KPLC faced logistical material challenges to supply transformers and other associated accessories and this delayed supply of electricity to Nyatoto Market. This is a line which is complex. It is using 45 feet poles, unlike the others which are about 11 or ten feet poles. Moreover, the unique condition of the soil, which is black cotton and swampy soil, coupled with heavy rainfall in February 2010, caused the poles that had been erected to get rotten within a very short period and this resulted in the falling of about 20 of them. We also had to check on the quality of the poles. So, the poles that we have now erected are okay."
}